(1)
Gan, J.; Xu, Y.; Shao, Y. Feasibility Study on the Calculation of Geotechnical Investigation Cost of Transmission Line Engineering --Taking a 500 KV Transmission Line Project an Example. HBEM 2025, 57, 78-83. https://doi.org/10.54097/enrxkp41.