Gan J, Xu Y, Shao Y. Feasibility Study on the Calculation of Geotechnical Investigation Cost of Transmission Line Engineering --Taking a 500 kV Transmission Line Project an Example. HBEM [Internet]. 2025 Jul. 7 [cited 2026 Aug. 26];57:78-83. Available from: https://hbem.org/index.php/OJS/article/view/379