Abstract

The "National Grid Corporation of China Transmission and Transformation Engineering Survey and Design Fee Estimation Standard (2014 Edition)" has been in use for than 10 years since its release. This paper aims to clarify the charging principle of survey fees for transmission line projects by detailed analysis of the calculation rules in the document and introduce usage of this document with an example of a 500kV transmission line project in a certain region.The "National Grid Corporation of China Transmission and Transformation Engineering Survey and Design Fee Estimation Standard (2014 Edition)" has been in use for than 10 years since its release. This paper aims to clarify the charging principle of survey fees for transmission line projects by detailed analysis of the calculation rules in the document and introduce usage of this document with an example of a 500kV transmission line project in a certain region.

Downloads

Download data is not yet available.

References

[1] Shi Weite, Ji Kaileen, Xin Cheng, Wang Ningning, Zhai Huijing. Research on optimization of the general cost of substation projects [J]. China Electric Power Enterprise Management, 2023, (03): 50-51

[2] Li Xi. Research on Cost Control of EPC Project of 110kV YQ Transmission and Transformation Project of S Electric Power [D]. Shandong University, 2022.

[3] Xu Yang, Li Xuyang, Niu Xin, Li Yongjie. Calculation method of integrated bidding limit price for feasibility and design of power grid project [J]. China Electric Power Enterprise Management, 2021, (27): 78-79

[4] Zhu Danju. Design effectiveness evaluation research of a certain 220kV transmission project [D]. Anhui University of Finance and Economics,2021.

[5] Liu Fang. Estimation and Economic Analysis of 110kV Transmission and Transformation Project Investment [J]. China High-tech Enterprises 2016, (21): 170-171.